Radio Hill Process Plant

Radio Hill Process Plant

Peritas was engaged by Process 26 to integrate the civil and structural elements of a 500,000 tpa gravity gold circuit into an existing plant in WA’s Pilbara region.

The design maximised the reuse of existing equipment.

Peritas’ scope included:

  • An audit of existing structures (and strengthening as required).
  • Structural analysis (static and dynamic) and design of all new transfer stations, tertiary crusher support structure, conveyor support structures, pipe racks, gold room, and their foundations.
  • Structural analysis and design of foundations for:
  • Gravity Circuit
  • Tailings Thickener
  • Eco Slab & Other
  • Interfacing of conveyor structures with the gold circuit.
  • Audit and structural refurbishment of the fine ore bin.
  • Tie into existing structures.
  • 3D modelling of all structural elements and interface with vendor equipment.
Location

Maitland, WA