by Edwin Liju | Apr 21, 2026
Fitzroy River Bridge Fitzroy River Bridge Temporary Works Peritas was engaged by the Fitzroy Bridge Alliance to provide temporary works and construction engineering support for the replacement of the Fitzroy River Bridge, following its failure during major flooding...
by kerrie@peritas.au | Feb 15, 2022
Scarborough Beach Road Pedestrian Bridge Scarborough Beach Road Pedestrian Bridge Peritas provided structural lifting design, documentation and construction support to BMD for the Mitchell Freeway Southbound Widening project. This particular scope involved lifting a...
by kerrie@peritas.au | Oct 1, 2021
Tonkin Gap Project Tonkin Gap Project More information Within the Tonkin Gap Temporary Works Engineering scope, a number of items required a higher level of expertise and bespoke engineering solutions. Peritas worked closely with the on-site team to ensure design...
by kerrie@peritas.au | Oct 22, 2019
Matagarup Bridge Matagarup Bridge Peritas Consulting were engaged initially by the Swan River Pedestrian Bridge Alliance to provide construction engineering design to assist in the installation of the bridge steel wishbone arches. The proposed installation method,...
by kerrie@peritas.au | Oct 22, 2019
Elizabeth Quay Elizabeth Quay During the stage 1 (early works), Peritas were engaged by Georgiou to provide construction engineering for the following: Underground electrical substation – design and documentation of sheet piling and support frames to allow for...