Fitzroy River Bridge

Fitzroy River Bridge

Fitzroy River Bridge Fitzroy River Bridge Temporary Works Peritas was engaged by the Fitzroy Bridge Alliance to provide temporary works and construction engineering support for the replacement of the Fitzroy River Bridge, following its failure during major flooding...
Scarborough Beach Road Pedestrian Bridge

Scarborough Beach Road Pedestrian Bridge

Scarborough Beach Road Pedestrian Bridge Scarborough Beach Road Pedestrian Bridge Peritas provided structural lifting design, documentation and construction support to BMD for the Mitchell Freeway Southbound Widening project. This particular scope involved lifting a...
Tonkin Gap Project – Temporary Works Engineering

Tonkin Gap Project – Temporary Works Engineering

Tonkin Gap Project Tonkin Gap Project More information Within the Tonkin Gap Temporary Works Engineering scope, a number of items required a higher level of expertise and bespoke engineering solutions. Peritas worked closely with the on-site team to ensure design...
Matagarup Bridge

Matagarup Bridge

Matagarup Bridge Matagarup Bridge Peritas Consulting were engaged initially by the Swan River Pedestrian Bridge Alliance to provide construction engineering design to assist in the installation of the bridge steel wishbone arches. The proposed installation method,...
Elizabeth Quay

Elizabeth Quay

Elizabeth Quay Elizabeth Quay During the stage 1 (early works), Peritas were engaged by Georgiou to provide construction engineering for the following:   Underground electrical substation – design and documentation of sheet piling and support frames to allow for...