Cape Lambert Utilities Workshop
Peritas provided structural engineering design, documentation and construction support services to Pindan for the design and construct of Rio Tinto’s Utilities Workshop at Cape Lambert.
The steel-framed building was completed in 2016 and comprised of a 1150m2 administration/office area (approximately) and a 615m2 workshop.
Aside from being designed for cyclonic conditions, the administration area was design as an importance level 4 structure and the workshop included a 20 tonne gantry crane.
All design and documentation was carried out in accordance with the RTIO standards.
Peritas are proud to be the designer for another successful Rio Tinto project.
Location
Cape Lambert, WA
Related Projects
OUR WORK IN ACTION
Perth Office
Melbourne Office
+61 3 8657 9292
Two Melbourne Quarter, Suite 306, 697 Collins St, Docklands VIC 3008
Legal
Terms & Conditions
Purchase Order Terms
Privacy Policy
Connect
Contact
Follow: