Radio Hill Process Plant
Client Process 26
Expertise Structural & civil design, documentation and construction support and site inspections.
Location Maitland, WA
Project Notes
Peritas was engaged by Process 26 to integrate the civil and structural elements of a 500,000 tpa gravity gold circuit into an existing plant in WA’s Pilbara region.
The design maximised the reuse of existing equipment.
Peritas’ scope included:
- An audit of existing structures (and strengthening as required).
- Structural analysis (static and dynamic) and design of all new transfer stations, tertiary crusher support structure, conveyor support structures, pipe racks, gold room, and their foundations.
- Structural analysis and design of foundations for:
- Gravity Circuit
- Tailings Thickener
- Eco Slab & Other
- Interfacing of conveyor structures with the gold circuit.
- Audit and structural refurbishment of the fine ore bin.
- Tie into existing structures.
- 3D modelling of all structural elements and interface with vendor equipment.